RAILWAY INFRASTRUCTURE

Earthwork in cutting and filling of railway embankment, preparation of sub-grade by ‘A’ category of soil/crusher  stone dust material, construction of balance RCC bridges, retaining walls, platform and other ancillary  works  including  P-way  works in the section from Monigram to Jangipur including yards in connection with Monigram-Nimtitadoubling.

Client : Eastern Railway.

Value :RS 3835.18 lacs

Earthwork in filling, cutting, blanketing, construction ofminor bridges, platform walls, flooring, drains, station building, Quarters, Gate lodge, F.O.B.P.F. shed and other ancillary works  in between Guptipara (excluding) &  Ambika–Kalna (including)  in connection with doubling between Jirat and AmbikaKalna.

Client : Eastern Railway.

Value : RS 1215.12 lacs 

Earthwork in cutting & filling of railway embankment, supplying & spreading blanketing materials over formation, construction of RCC Box, minor bridges, construction of PF sheds/ FOB, construction of service building and other ancillary  works  in between Mahipal Road and Manigram (km.187.91 to km.197.91) in connection with Azimganj-Manigram doubling.

Client : Eastern Railway.

Value : RS 1693.29 lacs 

Earthwork in filling, cutting, blanketing, construction of minor bridges, platform walls / flooring drains, station building, gate lodges, road etc. and other ancilliary works in between Talandu and Pandua from km.51.0 to km.61.0 in connection with construction of third line between Bandel and Bainchi.

Client : Eastern Railway 

Value : RS 2427.63 lacs 

Earthwork in formation by filling or cutting, construction of RCC culverts / slab / wing walls / bridges, linking of BG track, supplying and spreading of ballast and other ancillary  works  in doubling between Ahmedpur-Sainthia (including yards) for Khana – Sainthia doubling.

Client : Eastern Railway 

Value : RS 764.48 lacs 

Residual work in formation by filling or cutting earth, construction of RCC Box Bridge, RUB/culvert/slab/ wing wall / retaining wall / parapet wall drains and other ancillary works between ch.22.00 to ch.25.00 km in connection of BG line between Deoghar and Dumka.

Client : Eastern Railway 

Value : RS 450.84 lacs 

Earthwork in formation by filling, cutting, construction of minor bridges involving construction of RCC culverts / slab / wing walls etc. and permanent way of works with ballast supply, linking of tracks, insertion of points and switches etc. and other ancillary  works  in doubling between Pandaveswar and Panchrafrom Ch.0.00 to ch.9.75 km.

Client : Eastern Railway 

Value : RS 764.43 lacs 

Earthwork in formation by filling, cutting earth, construction of RCC culverts / slabs / wing walls / retaining wall / parapet wall / drains and other ancillary works in connection with proposed BG line between Dumka and Rampurhat from ch.118.35 km to 120.636 km. 

Client : Eastern Railway 

Value : RS 599.68 lacs

Earthwork in cutting, filling, blanketing for formation, extension of minor bridges, RCC pavement floor / road with vacuum dewatering, construction of labour hut etc. and other ancillary works in connection with Durgapur – Development of 3rd direct delivery line with world class freight terminal.

Client : Eastern Railway 

Value : RS 620.32 lacs

Earthwork in formation by filling / cutting, construction of minor bridges involving construction of RCC culvert / slab / wing wall etc. and other ancillary  works in connection with new line between Prantik and Suri.

Client : Eastern Railway 

Value : RS 407.72 lacs

Earthwork in cutting and filling on Railwayembankment, supplying and spreading blanketing materials over formation, construction of RCC box, minor bridges, retaining walls and other ancillary  works in the section between Karamtola to Pirpainti in connection with Sahibganj-Pirpainti doubling.

Client : Eastern Railway 

Value : RS 1682.33 lacs

Constructionof5Nos.BridgeswithRCCboxtypeculvert / slab/ wing wall / return wall and other ancillary works in connection with construction of new BG line between Manderhill and Dumka.

Client : Eastern Railway 

Value : RS 653.73 lacs